Trams in Todia

From MicroWiki, the free micronational encyclopædia
Jump to navigation Jump to search
Tramvia de Todia
Overview
StatusIn service
OwnerAutoritat de Transport de Todia
LocaleDistrict of Northern, Central and Southern Todia
Stations16
Service
TypeTramway
Services4
Operator(s)Autoritat de Transport de Todia
Depot(s)Estrella dels Vents / City of Todia
Rolling stock
  • Todstom Ciutadis 100 (M1)
*Todstom Ciutadis 500 (M2)
History
OpenedMay 2023
Technical
Operating speed5 km/h (3.1 mph)

Trams in Todia will be the major mean of transportation in Todia. The Tramway of Todia (catalan: Tramvia de Todia) will consist of four lines that will be opened in mid-2023. The President Christian Laudani approved the bill regarding the construction of the Tramway in April 2023. The map of the tramway was publishied on the website of the Generalitat de Todia on Saturday 6 May 2023.

M1 route

The Line 1 (M1) of the Tramway of Todia was in mid-May 2023 and has 7 stations. The line has one track and uses one Todstom Ciutadis 100 as its rolling stock. Estimated time to travel the line is 10 minutes.

Station Name Transfer Grade Branch Opening
Todia - Palau Above

Ground

City of Todia 18 May 2023
Todia - Museu
Todia - Oficina

de Correus

Bus
Port del Pacific L2 - L4 Port del Pacific
Ruva/Centre Bus Ruva
Las Llacunes/

Duana

Las Llacunes
Llibertat / Oest Llibertat 1 April 2024
Llibertat/Centre L3 18 May 2023

M2 route

The Line 2 (M2) of the Tramway of Todia was opened on 2 June 2023 and has 4 stations.

Station Name Transfer Grade Branch Opening
Port del Pacific L1 - L4 Above

Ground

Lhantse 2 June 2023
República
Centre Econòmic
Parc L3

M3 route

The Line 3 (M3) of the Tramway of Todia was opened on 9 July 2023 and has 5 stations.

Station Name Transfer Grade Branch Opening
Parc L2 Above

Ground

Lhantse 9 July 2023
Tsenter L4 Novotodivsk
Estrella Estrella dels Vents
Jardí Botanic Llibertat
Llibertat / Centre L1

M4 route

The Line 4 (M4) of the Tramway of Todia will be opened on 20 December 2023 and has 3 stations.

Station Name Transfer Grade Branch Opening
Tsenter L1 - L2 Above

Ground

Novotodivsk 20 December 2023
Ploščad
Tchaikovsky 1 April 2024
Port del Pacific L3 Port del Pacific 20 December 2023

External links