SNS Marley
Jump to navigation
Jump to search
This article needs more links to other articles to help integrate it into the encyclopedia. (July 2023) |
The SNS Marley on its maiden voyage on a lake. | |
Surdam | |
Name | SNS Marley |
---|---|
Namesake | A dog named Marley |
Ordered | 15 July 2022 |
Commissioned | 16 July 2022 |
Identification | MFC-1 |
SNS Marley (MFC-1) was a ship built by TFBC and served the Surdamian Navy for a short time.
History
The Surdamian Navy commissioned the TFBC to build a new destroyer for the fleet on July 15, 2022. TFBC completed the ship on July 16. SNS Marley was the first and last ship of the Marley Frigate Class. On its maiden voyage the ship sailed around for a bit till disaster struck.
Capsizing & Retirement
During the voyage a huge gust of wind struck the ship on its starboard side causing the sail to instantly pull the ship in the direction of the wind in less than a second causing the ship to capsize. After waiting for an hour the wreck was recovered and the ship was damaged beyond repair causing it to be retired.